BuilderCycle needed a new logo design and created a contest on 99designs.
A winner was selected from 77 designs submitted by 18 freelance designers.
BuilderCycle
The faster way to build.
This is a construction management, scheduling and collaboration software. It is a browser application and also iOS app. The target audience are construction project managers and tradespeople.
Top 3 things to communicate:
Save time in your day by using this streamlined system for scheduling.
Build projects faster with better quality.
Easily coordinate your entire team.
Would prefer to not have an polygonal shape that resembles a street/road/construction sign.
Logo should be graphic only or graphic with minimal stylized text, please also supply accompanying non-stylized text company name in an appropriate font.
Don’t want logo that looks anything like an orthogonal cube
Some of the related companies in this sector include:
http://www.plangrid.com
http://www.fieldwire.com
http://www.procore.com
http://www.co-construct.com
http://www.buildertrend.com
Find out how a design contest works or learn more about our logo design services.